1. The Defendant paid KRW 49,993,759 to the Plaintiff KRW 5% per annum from May 28, 2016 to December 12, 2018.

Reasons

1. The following facts are acknowledged to the effect that there is no dispute or the entire pleadings, in addition to each macro- documentary evidence.

The defendant operates the business "D" in Yangsan City C.

The company is a logistics company that is supplied with empty water such as the right road and supplies it to other places.

[A] On September 6, 201, the Plaintiff was employed by the Defendant on September 6, 201, and worked for the Defendant as a simple labor position, such as transporting products to warehouse buildings using a kc truck, such as the right trees, from the said company.

[A] On the Defendant's factory building on the 1st underground and the 2nd above ground, a string for product transport is installed on the 1st floor below the lower right photograph.

This is a device installed to transport products from the first floor to the second floor above the ground or the first floor below the ground inside the building, which is operated in the same principle as the elevator for cargo.

On the upper half of the first floor of the ststststst tape, the upper half of the stststst tape is installed only on the upper upper part of the stststst tape of the ground (in this case, the yellow pressing attached to the right side of the upper photo) and there is no separate operating tool on the upper floor and the second floor above the ground.

On both sides and back sides of the ststststroids, a wire network is installed to prevent the fall of loaded goods. On the front side, there is no separate blocking door so that the string truck loaded with the product to be transported can be loaded as it is. However, this part of the photographs of the left side of this part is the shape where the stringr and moving passage on the first floor from the second floor of the factory of the defendant. At the time of the accident of this case, the steel chain was installed on the front side of the same type as the 2nd floor at the time of the accident of this case.

In the same way, the steel chain was suffering from both columns.

The work order using a stststrue shall be as follows:

In other words, products have been loaded into a string string in the first floor as above.