Text
1. The plaintiff's lawsuit against the defendant Han-chul is dismissed.
2. The Plaintiff:
A. The defendant corporation.
Reasons
. Inasmuch as the description is the same, I examine only the recognition of this Court and the assertion of the other parties.
A. The plaintiff's assertion regarding the plaintiff's assertion 1) 2. The plaintiff's construction specifications different from the starting drawings of the apartment of this case [Attachment 3] 2. The construction specifications different from the starting drawings of the plaintiff's assertion were submitted to the competent administrative agency at the time of the construction permit and the commencement report, and there are no circumstances such as lawful modification of the construction specifications with the consent of the buyer (to move-in) as stipulated in the Housing Act, 216,113,584 won should be included in the cost of repairing defects in the so-called subjective defects. [Attachment 3] 2. The construction specifications different from the installation drawings of the plaintiff's allegation 4. 2. 1. 4. 2. 2. 1. 4 2. 6 2. 4 2. 4 6 2. 4 2. 4 2. 4 20 2. 9 0 2. 750 210 2. 293 2012- 25 2. 21. 28 2. 25 2. 2. 3