(영문) 광주고등법원(전주) 2015.11.12 2013나4086
손해배상(기)
Text

1.The judgment of the first instance shall be modified as follows:

The defendant is jointly with the co-defendant G of the trial court and the plaintiff is 121.

Reasons

1. Basic facts

A. On January 17, 2010, the Defendant confirmed that water leakage was generated in the studio of the second floor above H in the Hasan-si (hereinafter “the instant studio”) and requested G engaged in boiler water supply system business, water leakage detection business, etc. with the trade name of I.

B. At around 15:00 on January 21, 2010, G found that water leakage detection is being carried out by the Plaintiff’s female-friendly job offers B from the Defendant during the process of water leakage detection using water leakage detection devices at the above studio, which was leased by the Defendant, and the floor of the above studio was set up in order to confirm this.

C. At the time, three main walls of the instant 104 were placed outside the main wall of the LPG gas. Of them, one of them was connected to the gas sirens in the main wall of the instant 104, which are laid down on the main wall of the said 104 main wall, depending on the gas source passing through the main wall inside and outside the main wall through the hole of the lower part of the main wall of the said 104, and the remaining two were linked to the main concrete floor of the instant 104, which are laid down on the main concrete floor of the said 104, 103, and 102.

G B B Before performing the main concrete floor excavation work of the studio 104 of this case, the Defendant was allowed to lock all the valves of the above gas tank, while G moved back the singke and the gas sirens on the singke in the above 104 main room to side.

E. From January 21, 2010 to 17:30 of the same day, G sold two concrete floors of the lower part of the main room 104 of this case from the main room 104 from the point of January 21, 2010 to the point of 17:30 of the same day, by means of crying, heavy-neting, strawing, insertinging, and inserting, etc., and sold one concrete floor of the central part of the said main room at a size of approximately 30 cm in diameter and about 30 cm in depth.

F. G’s studio 104 of this case’s main main part of the main floor is laid underground a studio similar to the gas studio in concrete.

arrow