logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 대전지방법원 논산지원 2014.02.18 2013고단547
수질및수생태계보전에관한법률위반
Text

1. Defendant shall be punished by a fine of 2,000,000 won;

2. If the defendant does not pay the above fine, fifty thousand won.

Reasons

Punishment of the crime

The defendant is a person who has been a inside director of the company B which runs the business of producing and selling polypropyal marina.

A person who intends to install a wastewater discharge facility shall report to the competent authority, but the Defendant installed and operated other textile product manufacturing facilities (storage facility capacity: 63.06 cubic meters) at the place of business of a stock company located in B from April 2, 2010 to February 26, 2013, which is located in B from February 2013.

Summary of Evidence

1. Statement by the defendant in court;

1. On-site photographs, confirmation of collection of samples, request for sample analysis, results thereof, certificates of factory registration, and each investigation report (including each accompanying document) or application of statutes on images;

1. Article 76 subparagraph 1-2 of the Act on the Conservation of Water Quality and Aquatic Ecosystem (Amended by Act No. 11979, Jul. 30, 2013) and Article 33 (1) of the same Act concerning facts constituting an offense;

1. Articles 70 and 69 (2) of the Criminal Act for the detention of a workhouse;

1. It is so decided as per Disposition for not less than Article 334(1) of the Criminal Procedure Act.

arrow