(영문) 창원지방법원 통영지원 2017.02.14 2016가단23839
약정금
Text

1. The Defendant shall pay to the Plaintiff KRW 160,00,000 and the interest rate of KRW 15% per annum from July 27, 2016 to the day of full payment.

Reasons

On February 4, 2010, the Plaintiff and the Defendant entered into a design contract (hereinafter “previous design contract”) with the Defendant to promote the new construction and sale business of multi-family housing (hereinafter “instant business”).

2. Location of a building site: Shimyoung-si and 54 lots (hereinafter referred to as “instant building site”).

3. Design contents: 1) A site area: 38,023.00 square meters (the site area for actual use: 34,817.00 square meters): A multi-family housing (multi-family housing) number: 2 stories underground and 20 stories above ground: A total floor area of 6,788.97 square meters: 94,481.2107 square meters;

4. Contract area: A contract area may be increased or decreased at the time of approval (28,581 square meters) of 94,481.2107 square meters.

5. Contract amount: 1,100,000,000 won, and the contract area and period of Article 2 separate of the value-added tax for the imposed portion.

4.550,000,000 at the time of receipt of the deliberation on traffic impact assessment at the time of receipt of the project approval at the time of receipt of the project approval, 4.555,000,000 at the time of 4.55,000,000 of the non-fixed and non-fixed and non-fixed contracts;

4. By 30.0

4.5 50,000,000 prior to deliberation on construction or urban planning shall be paid for consultation.

37 Consultations shall be paid upon completion of project approval.

20 shall be paid after consultation on construction drawings.

Ten consultation shall be paid upon commencement of the construction project.

Sales in lots 30% 5 Payment in consultation

50% 5% of the sale shall be paid by consultation.

5 Consultations shall be paid when the use is received.

On March 26, 2010, the Defendant applied for a deliberation on traffic impact assessment on behalf of the Plaintiff on behalf of the Plaintiff under the previous design contract, and applied for a deliberation on traffic impact assessment to the public viewing, a competent authority, on May 25, 2010. On August 5, 2010, the Defendant supplied various design documents to the Plaintiff.

From February 5, 2010 to May 25, 2010, the Plaintiff paid a total of KRW 160,000,000 to the Plaintiff.

The operator of the project in this case is replaced.