(영문) 광주지방법원 2015.08.12 2015고합93
특정경제범죄가중처벌등에관한법률위반(사기)등
Text

Defendant

A Imprisonment with prison labor for one year, for three years, for three years, and for two years, for Defendant C, respectively.

except that this shall not apply.

Reasons

1. According to the evidence duly adopted and examined by this court, the following facts can be acknowledged.

【Summary, etc. of the Korean Electric Power Corporation Electronic Tender System】

(a) Electronic tendering under the method of qualification examination among various electrical construction ordered by the Korea Electric Power Corporation (hereinafter “Korea Electric Power Corporation”) is conducted on its own Electronic Procurement System (htp:/rm.keco.net) and the value-added tax is added to the estimated price (an amount that provides for the scope of application of the criteria for qualification examination) and the preliminary price (an amount that provides for the method of bidding, contract, determination of methods of contract, and qualification examination) within a certain percentage based on the basic price, and is multiple preliminary price (hereinafter “dual price”).

(2) The Electronic Procurement System server shall, prior to the conclusion of the tender, select 15 of the basic amount of the preliminary price for the relevant construction before the date of the tender 【2.5% of the basic amount of the 1,365 reserve price which can be created within the limit of 16:5% prior to the end of the tender, and store them after encryptioning. (3) If the bidder arbitrarily selects 4 of the 15 preliminary lot number which represents each of the preliminary prices, the value shall be transmitted and stored in the server. (4) Upon the commencement of the opening, the Electronic Procurement System server shall automatically connect the 15 preliminary price to the 15 preliminary lot number, and then automatically connect the 15 preliminary price to the 15 preliminary lot number, and then the successful bid price corresponding to the highest 4 preliminary lot number selected by each bidder is determined, and the average bid price of the construction project, the bid price of which shall be less than 10.5 billion won, and the bid price of which shall be less than 1.75 billion won.7 billion won.7 billion won.