logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 수원지방법원 성남지원 2015.11.06 2015고단1977
개발제한구역의지정및관리에관한특별조치법위반등
Text

A defendant shall be punished by imprisonment for not less than eight months.

However, the execution of the above punishment shall be suspended for two years from the date of the final judgment.

Reasons

Punishment of the crime

From March 27, 2008, the Defendant was operating a restaurant in the name of “D cafeteria” after filing a business report with “19.71 square meters of business size, food service business, business type general restaurant” in Gwangju-si from March 27, 2008.

1. Any person who intends to construct a building, change the purpose of use, install a structure, change the form and quality of land, cut bamboo and trees, divide land, store articles, etc. in a development restriction zone shall obtain permission from the competent authority;

Nevertheless, on June 2014, the Defendant, without obtaining permission from the competent authority for profit-making purposes, installed a parking lot of a size of 1,200 square meters in Gwangju-si, which is a development restriction zone, and changed the form and quality of land.

2. Any person who intends to divert farmland shall obtain permission from the competent authorities;

Nevertheless, the Defendant, without obtaining permission from the competent authority on June 2014, set up a parking lot of a size of 1,200 square meters in Gwangju-si, a farmland, and converted farmland into farmland.

3. Any person who violates the River Act shall obtain permission from the competent authority from a person who intends to occupy and use land, occupy and use river facilities, build and rebuild a structure, excavate or alter land, excavate land, alter the form and quality of land, alter the form and quality of land, extract soil, sand

Nevertheless, the Defendant, without obtaining permission from the competent authority from around 208 to August 10, 2015, performed a concrete package of the size of 217.5 square meters in Gwangju City F (F), which is a river area, and used it as an outdoor business site in the above restaurant. On May 2012, the Defendant installed a steel removal bridge and occupied the land without permission by installing a steel frame of the size of 437 square meters in a size of 437 square meters in a size around June 2015.

Summary of Evidence

1. Defendant's legal statement;

1. An investigation report (a report attached to a cafeteria, an illegal investigation report, etc.);

1. A report on investigation is filed on September 12, 2015, and a D cafeteria on September 14, 2015.

arrow