(영문) 서울중앙지방법원 2017.10.27 2015가단5108843
구상금
Text

1. Defendant B, C, D, E, and F jointly share to the Plaintiff KRW 73,503,525.

Reasons

1. Facts of recognition;

A. The G building in relation to the ownership and management of the G building (hereinafter “instant building”) is a complex building with the total floor area of 146,071.39 square meters above H in Gyeyang-si and the area of 7 stories below 146,071.39 square meters below 5 stories below underground. The number of accommodation per day is 32,633, average number of visitors is 9,800 persons, and the underground floor is linked to the subway I. The underground connections connected to the subway.

The above buildings are divided into shopping mall Dong and terminal Dong, and the J filmer had been operated from the fifth to the seventh above ground of the shopping mall Dong, and K was planned to work for the first to the fourth above ground.

In addition, L Terminal was operated on the third floor above the terminal, from the first floor to the second floor above the ground.

In addition, the underground floor of the above building is not divided into shopping malls and terminal Dongs, and the underground first floor is an underground structure, and after the lease by Defendant A Co., Ltd. (hereinafter “Defendant A”), was performing the internal construction to operate a focot, and the second underground floor was used as a parking lot from the third to the fifth underground floor.

The instant building acquired ownership on February 2012 by N Co., Ltd. (hereinafter “N”), and completed the registration of ownership transfer under the name of the said company on the 10th of the same month, trusting the ownership of the pertinent building to the Asian Trust Co., Ltd., and N entered into a management service contract with Defendant B Co., Ltd. (hereinafter “Defendant B”) on the 20th of the same month, and entered into a facility management service contract with respect to the said building (FM: FM) and entrusts Defendant B with the facility management of the said building on March 21, 2012 and completed the instant building on March 21, 2012.

6. 18. The L Terminal has been operated as transportation facilities, etc. after commencing the operation of L Terminal.

N on February 18, 2014, by extending the contract period with Defendant B by February 19, 2015, Defendant B continued to operate the facility and then March 12, 2014.

arrow