(영문) 부산지방법원 2018.08.09 2017가합46956
매매계약무효확인등
Text

1. Of the instant lawsuit, each of the Plaintiffs and the Defendants, other than Plaintiff F, are listed in the separate sheet.

Reasons

1. Basic facts

A. Status 1 of the parties to the case

(1) The project that newly constructs a collective housing (hereinafter referred to as the “instant project”) on the land of Busan Shipping Daegu IFG as the project area.

(C) Defendant C&C Co., Ltd. (hereinafter “Defendant C&C”).

(2) On October 21, 2009, the Plaintiff is a project implementer which entered into a contract with Defendant Landf Construction to succeed to the status of the instant arrangement under the agreement entered into with the Plaintiffs during the process of promoting the instant project, and jointly promoted the instant project with Defendant Landf Construction. (2) The Plaintiff Landf Construction Co., Ltd., included in the instant project site, JJ large 15 square meters and its ground buildings; Plaintiff B, Ix 251 square meters; Plaintiff C, K large 157 square meters and its ground buildings; Plaintiff D L large 95 square meters and its ground buildings; Plaintiff E L large 146 square meters and its ground buildings; Plaintiff C’s 114 square meters and its ground buildings; Plaintiff G 139 square meters and its ground buildings; Plaintiff Plux 146 square meters and its ground buildings; and Plaintiff H are owned by each owner of the relevant building.

(hereinafter referred to as “each of the instant real estates,” in total, owned by the Plaintiffs.

1) As to the real estate listed in the corresponding column for each of the corresponding columns for each of the plaintiffs in the separate sheet between the plaintiffs, the agreement on the real estate sales contract of this case is prepared as follows (hereinafter "the agreement of this case") and the agreement on the real estate sales contract of this case.

A) The text of the instant agreement is as follows. (The instant agreement refers to the Plaintiffs, the seller, and the seller, and the seller, “B”, respectively. Article 1 (For the purpose of this Agreement, “A” is a multi-family housing construction project.