(영문) 수원지방법원 안산지원 2012.01.17 2011고단2316
뇌물수수등
Text

Defendant shall be punished by imprisonment for a period of two years and six months and by a fine of thirty thousand won.

The defendant does not pay the above fine.

Reasons

Punishment of the crime

The Defendant, a public official E, from July 28, 2006 to July 5, 2007, from July 6, 2007 to September 28, 2008, served as the head of the vehicle management office from September 29, 2008 to October 20, 2009, and the head of the F Center from October 21, 2009 to September 19, 201.

1. As above, the Defendant, while working as a construction manager, was in charge of managing and supervising the design and construction performance report of the construction work between H, payment of the construction cost, and change of the construction cost, etc. The construction work between H was to be executed by K with the total construction cost of KRW 75.2 billion for five years from Oct. 1, 2002 to Sept. 24, 2007, on the land bypassing the national highways of about 5.48 km in total from J to Sept. 31, 201. Since 205, the construction work between H was to be executed by K with the total construction cost of KRW 75.2 billion for five years from Oct. 1, 2002 to Sept. 24, 2007. The total construction cost was increased to KRW 1,26.9 billion and the construction period was extended to December 31, 2011.

Since frequent design change and increase in construction cost have occurred as seen above in relation to the above construction, L, which is the site manager of the above L, as a result of the design change, has secured profits to the maximum extent possible by being determined in close to the design value, has made the defendant, who is a person in charge of the construction cost, to receive the construction cost promptly, made a solicitation to this effect, and the defendant was willing to receive a honorarium in return for accepting the above L’s demand.

On November 20, 2006, the Defendant received a solicitation from the Defendant to the effect that “as soon as possible treatment is made so that the construction cost of the expansion section of the H-B road construction can be reflected to the maximum extent,” while boarding and leaving the car of L, which is the site manager of the construction works of the construction works of the construction of the H-H roads, in the vicinity of the Man-gu Incheon Metropolitan City, Ansan-si, and the said solicitation is made on the same page.