logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 대전지방법원 2014.10.06 2014고단2244
특수절도등
Text

Defendant

A Imprisonment with prison labor for two years, and for one year, for Defendant B.

Defendant Nos. 5 and 6 of seized evidence.

Reasons

Punishment of the crime

[2014 Highest 2244] Defendant A was sentenced to two years of imprisonment with prison labor for the obstruction of performance of official duties at the Suwon District Court on June 29, 2012, and the judgment became final and conclusive on January 1, 2013, and completed the execution of the sentence at the female prison on June 12, 2013, which was sentenced to ten months of imprisonment with prison labor for fraud at the Suwon District Court on February 5, 2014.

Defendant

B On June 12, 2013, the Suwon District Court sentenced eight months of imprisonment for fraud at the Suwon District Court, and completed the execution of the sentence on December 5, 2013 by a female prison.

1. The Defendants’ co-principaled Defendant A was aware in advance of the fact that the management of materials, such as clean dipin, etc. necessary for the installation of rains at a small-scale construction site, was neglected due to the power that Defendants A worked as workers installing rains at the construction site, and Defendant B’s sand position plate assembly workers.

The Defendants: (a) remodeled a vehicle with a vehicle with a long-term siren to easily load damaged goods by means of cutting off the back rocks, etc. in order to steals materials such as a non-interdin connected to a small-scale building site near a relatively neglected small-scale construction site; and (b) used during late night hours to steal construction materials stored in the construction site across the country.

On April 27, 2014, between 00:15 and 00:45, the Defendants came to work at the construction site of Pyeongtaek-si D, Defendant B’s network to which any person exists, and Defendant A, the victim E, loaded 80 bits in F Kan car at a total amount of 11.20,000 won.

Defendants shall be jointly and from that time on the same year.

6. Until December 27, 28, building materials in total amount equivalent to 66,310,000 won were stolen through the same method, as shown in Appendix 1.

2. Defendant A’s theft came to have been loaded in the Pyeongtaek-si G G-type room between March 25, 2014 and 20:28, in the middle of Pyeongtaek-si G-type, the total market price of which is the victim H is KRW 20 million (1,000).

arrow