(영문) 서울남부지방법원 2015.10.21 2013가단212985
구상금
Text

1. The Defendants are jointly and severally and severally liable to the Plaintiff for payment of KRW 73,244,686 and the period from July 25, 2012 to October 21, 2015.

Reasons

1. Basic facts

A. The Plaintiff is a public corporation entrusted with the industrial accident compensation insurance business by the Minister of Employment and Labor under the Industrial Accident Compensation Insurance Act (hereinafter “Industrial Accident Insurance Act”), and the Nonparty B (hereinafter “victim”) is a person who suffered the following accidents, and the Defendant A is a driver and owner of a non-exclusive tramway type C (hereinafter “afforcing type”) and the Defendant Heung National Fire & Marine Insurance Co., Ltd. (hereinafter “Defendant Company”) was an insurance company that entered into a mid-term equipment safety insurance contract with Defendant A on July 5, 2010 with respect to the accelerator.

B. On September 24, 2010, at around 13:00, at the construction site for new construction of the E-building located in Guro-gu Seoul Metropolitan Government D (hereinafter “E building construction site”), victims, who are workers belonging to the constructor Daland Construction Co., Ltd. (hereinafter “Saland”), instructed the construction contractor to adjust the site for construction after removal work, and according to the direction, Defendant A moved the upper body only at the lower body while the lower body was fixed, and throw away construction wastes from the lower body to the right side of the construction site, while moving back from the left side of the construction site to the right side of the tidal wave base for the cutting off, the accident occurred to the right side of the floor (hereinafter “the accident”), and the victim suffered from scarcity and scarcity, etc., and suffered from the scarf’s mental disorder and the scarf’s mental disorder.

C. By July 25, 2012, the Plaintiff paid KRW 133,988,670 in total, as an industrial accident insurance amount, the amount of health care benefit 24,39,240, temporary disability compensation benefits 43,793,680, and the amount of disability benefits 65,795,750 in lump sum.

[Reasons for Recognition] Facts that there is no dispute between the parties, Gap evidence Nos. 1 through 6, Eul evidence Nos. 1, 2, 6 and 7, and the purport of the whole pleadings.