Text
Defendants shall be punished by a fine of two million won.
The Defendants did not pay each of the above fines.
Reasons
Punishment of the crime
The victim agricultural company F (ju) performed the construction of a new building area of 768.12 square meters in Cheongju-si, the building area of 768.12 square meters in Do, Class 1 and Class 2 of 2 above ground, and the defendant A is a person operating I in Cheongju-si, the petitioner site adjacent to the above construction site, and the defendant B is a head of J village and K head of Tong-gu, the natural village where the above construction site is located.
1. The Defendants conspired to act from July 3, 2015 to the same year.
9. Until the Haman of L clan owned by L clan, he set up a steel pole on both sides by a width of about four meters between the roads located between the Ma-gu, Sin-si and N-owned Gu office building site, and set up a crossing at about three meters above the steel pole, thereby preventing the victim from entering the construction site, thereby obstructing the work of the victimized person by force.
2. The Defendants conspired with each other from July 5, 2015 to the same year.
9. During the Habman, P owned P’s private house Q Q reply and R’s petition house prior to S, a steel pole was installed in each of the said columns, and the steel plate was installed in one string of dancing, and the victim’s construction work was obstructed by force, by way of force, to prevent the entry of the construction site into the construction site in which the victim was in operation.
3. On July 17, 2015, at the same place as Paragraph 1, at the same time as Paragraph 1, the Defendants conspired to enter the ready-mixed vehicle in order to temporarily remove the height restriction facilities installed as stipulated in Paragraph 1 at the construction site of the damaged party. Defendant B obstructed the front of the ready-mixed vehicle with T 1 ton truck, and Defendant A prevented other vehicles from driving the above ready-mixed vehicle on the land by blocking other vehicles from driving the above ready-mixed vehicle on the land, and prevented the above ready-mixed vehicle from entering the construction site, thereby hindering traffic and hindering the damaged party’s work by force.
4. The Defendants conspired on August 11, 2015.