(영문) 서울중앙지방법원 2020.09.11 2018가합503526
손해배상(기)
Text

1. The Defendant’s KRW 970,858,025 among the Plaintiff and KRW 470,093,100 among the Plaintiff, shall be KRW 404,415,247 from February 13, 2018.

Reasons

1. Basic facts

A. Status 1 of the parties, etc.) The Plaintiff is the Seocho-gu Seoul Metropolitan Government apartment (hereinafter “instant apartment”).

(2) The Defendant is a seller of the instant apartment, and the Intervenor’s Intervenor’s Intervenor (hereinafter “Supplementary Intervenor”) was awarded a contract for the instant apartment construction work (hereinafter “instant construction”).

(hereinafter referred to as the “Defendant, etc.”). B., the Defendant and the Intervenor.

The instant apartment complex was approved on May 24, 2010 and approved on January 18, 2013.

The apartment of this case caused various defects in the section for common use and section for exclusive use by constructing the apartment of this case as a design error, or as a result, the construction company, such as the supplementary participant, did not construct the part to be constructed in accordance with the design drawings, etc., or revised differently from the design drawings, etc., and thereby, the function, aesthetic, or safety problems were inflicted on the apartment of this case.

Accordingly, the Plaintiff requested the Corporation, including the Defendant and the Intervenor, to repair the defects that occurred in the instant apartment from the time of approval for the use of the instant apartment at the request of the occupants and the sectional owners. However, there still exist such defects as stated in the attached Table 2, the table of the defect in the section for common use, and the table of the table of the defect in the section for common use, and the repair cost is based on the seal, and even if there are items that are not separately determined below, the repair cost is calculated based on the results of each appraisal supplementary commission as to the appraiser D of the instant apartment, by reflecting the modified results.

The sum of KRW 1,363,658,451 is the same as the statement.

The comprehensive balance sheet of repair cost of defects shall be the same.