(영문) 서울중앙지방법원 2015.01.16 2014가합500
손해배상(기)
Text

1. All of the claims filed by the Plaintiff (Counterclaim Defendant) and the Plaintiff, and the counterclaim claims by the Defendant (Counterclaim Plaintiff, Counterclaim Plaintiff, and Appointed Party).

Reasons

1. Basic facts

A. The Defendant and the Selection L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L, L L L L L L L L L L L L L 201, L L L L L L L L L L L L L 102, Eul 102, Eul 102, Eul 102, Eul 302 and 302.

B. The head of the instant household, at around November 1, 2009, passed a resolution of the D Borrowing Reconstruction Group to reconstruct Franra A Dong and B Dong (hereinafter referred to as the “F loan”) (hereinafter referred to as the “CF loan”). On November 1, 2009, the instant head of the instant household delegated the Plaintiff Q, the head of the Plaintiff, with all duties and authority relating to the FF loan reconstruction construction.

C. 1) Conclusion of the First Agreement: Q, the representative of the F loan reconstruction group, is the Sungdon Construction Co., Ltd. on February 8, 2010 (hereinafter “Madon Construction”).

B) As to the FJ reconstruction project, the construction site E, G, and construction period were from April 2010 to November 201, 2010; the supply price was KRW 1 million per square meter; and the design amount: KRW 27,000 per square meter (excluding value-added tax); Q entered into a provisional contract on July 1, 2010 (six months after the date of commencement between the G tunnel safety diagnosis and building permit approval); the standard construction contract for the private construction project (hereinafter referred to as “contract 1”).

The defendant and the designated parties of the second contract will terminate the first contract on June 30, 201 on the ground that the Sungduk Integrated Construction, which was intended to obtain a construction permit until August 10, 2010, failed to obtain a construction permit within the said period and did not provide a detailed statement of construction cost.