1. The plaintiff's appeal is dismissed.

2. The costs of appeal shall be borne by the Plaintiff.

The purport of the claim and appeal is the purport of the appeal.

Reasons

1. Basic facts

A. On February 2016, the Defendant entered into a contract for construction work between the Defendant and C Co., Ltd. (hereinafter “C”) on the construction work of the new construction work of D Ground Store D (hereinafter “instant housing”) at Kimpo-si (hereinafter “instant construction work”) (hereinafter “instant construction work”).

(hereinafter “instant construction contract”). The main contents of the instant construction contract are as follows.

The standard construction contract for construction works: The contract amount on August 30, 2016 (based on the date of actual completion) completed on April 30, 2016 (based on the date of actual completion): The contract amount on August 30, 2016 (based on the date of actual completion): the time and method of the completed portion of KRW 600 million, and the contract amount of KRW 10,000,000,000 for the first part payment of KRW 50,000,000,000 for the second part payment of KRW 10,000,000 when the completion of the second part payment of KRW 50,000,000 when the construction of the second part payment of KRW 10,000,000 is completed, the contract amount shall be replaced by the monthly deposit for KRW 34,40,000,000 at the completion of the second part payment of the construction of KRW 4,000,00.

The warranty period of 1 year defect repair deposit rate of 2% per year shall be 0.003% per annum 10. 10% per annum 1) constructed in each household remote area and combined remote area. 2) The flooring materials of each household shall be constructed on the flooring and scoke day.

12. 1) The Triju Triju is a construction project consisting of ksks shower and knife knife knife knife knife knife knife knife knife knife knife knife knife k

16.Other construction 1) Of the interior finishings of the commercial building on the first floor, the installation of a ceiling studio studio studio studio studio studio studio studio studio studio studio studio studio studio studio

3) Materials and construction, other than the specifications, shall be settled separately through consultation between both parties. 4) The scope of studio electric appliances products is TV, cooling, air conditioners, washing machines, gas sirens, and gas sirens for studio electric appliances.