logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 대전지방법원 천안지원 2018.10.17 2017가단109065
손해배상(기)
Text

1. The plaintiff's claim is dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

1. Basic facts

A. The Plaintiff is a legal entity running a laundry in Asan City C (hereinafter referred to as the “laundry in this case”), and the Defendant is a person operating the Fcar Center in Asan City E.

B. On December 26, 2016, G of the Plaintiff’s representative director: (a) the H 2.5 tons truck used at the laundry on or around December 26, 2016 (the date of the first registration on June 16, 2006; hereinafter the same shall apply in this case) was placed in the car center operated by the Defendant due to the following: (b) the Plaintiff’s representative director’s operation of the H 2.5 tons truck (the date of the first registration on June 16, 2006; (c) the “amount from the date of the first registration on which the truck was manufactured

C. On December 29, 2016, the Defendant exchanged brings and wheelchairs screeners, and carried out the instant truck to G on the following day, based on the bring prevention device (ABS: An ABS Syke Syke, hereinafter “ABS”) malfunctions, and based on the bring prevention device (ABS), exchanged brings among ABS valvess, and transferred the instant truck to G on December 29, 2016.

G, on December 30, 2016, the following day, reported the flow of the instant truck ABS part, and again brought the instant truck to the Defendant. The Defendant did not discover any more than the ABS framework part, but was authorized to leave the operation after removing the ABS server in order to verify whether there is any harsh water leakage.

E. On January 2, 2017, the date of the instant truck continues to exist, the Defendant, on a hand, authorized the Defendant to sprink up the injecting part of the tank and to look at the operation thereof.

F. On January 12, 2017, G brought the instant truck to the Defendant again, and the Defendant confirmed that no longer water leakage exists, and assembled ABS CBS server.

G. On January 25, 2017, G parked the instant truck in front of the instant laundry, around 19:00, but around 23:48 on the same day, G parked the instant truck, which was parked on the instant truck and its lower 31.2 tons, and the building, machinery, equipment, and laundry of the instant laundry.

(hereinafter referred to as the "fire of this case").

arrow