logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 의정부지방법원 2017.06.29 2016나54125
보험에관한 소송
Text

1.The judgment of the first instance shall be modified as follows:

The defendant's vehicle B, which occurred on March 26, 2015, is a traffic accident.

Reasons

1. Basic facts

A. The Plaintiff is an insurer who entered into a comprehensive motor vehicle insurance contract (the insured is a basic purchase agreement for driver limited-term agreements) with respect to the D motor vehicle (YF Lata, hereinafter referred to as “dial vehicle”) between E, and the Defendant is the owner of B motor vehicle (benz S500L 2008 type, hereinafter referred to as “victim”).

B. On March 26, 2015, E, around 10:05, 10:05, driven a sea-related vehicle in the vicinity of the Han River Park in Mapo-gu Seoul, Mapo-gu, Seoul, and was shocked behind the damaged vehicle.

(hereinafter “instant accident”). C.

Due to the instant accident, part of the back part of the back part of the damaged vehicle was broken and damaged by transparency films, white films, etc.

(The damaged vehicle was its original color, but its transparent film and white film was constructed, which was white at the time of the instant accident.

On March 26, 2015, the date of the instant accident, the damaged vehicle was towed to “G Motor Vehicle Maintenance Service” operated by F.

F sent the damaged vehicle to the automobile maintenance shop of H, Inc. (hereinafter referred to as “I”), the representative of H, to repair the pan-day wave. On March 30, 2015, the F was returned to the damaged vehicle whose restoration and painting was completed.

(2) On March 2, 2015, the Defendant: (a) examined the damaged vehicle that was repaired on March 30, 2015; and (b) demanded the latter to exchange the damaged vehicle on the ground that the latter is cornerd. E) The F sent the damaged vehicle to the automobile maintenance station for the I’s operation on March 30, 2015 (hereinafter “the latter repair”). The damaged vehicle was consigned to the Seoul J (K) business establishment located in order to use the latter film work on April 2, 2015, but the latter is entrusted to the Seoul J (K) business establishment, and the latter films work on April 2, 2015.

arrow