(영문) 대구지방법원 경주지원 2017.01.19 2015고단888
업무상과실치상
Text

Defendants shall be punished by imprisonment without prison labor for eight months.

However, each of the above cases against the defendants for two years from the date of the final conclusion of the judgment.

Reasons

Punishment of the crime

E Co., Ltd. has been contracted out by G Co., Ltd. from November 11, 201 to work F Corporation from November 201.

Defendant

B is the vice head of E corporation, a person who manages and supervises the figures as the head of the field work management team at the construction site, and the defendant A is the director of the electric power division at the construction site and the person in charge of electric safety management at the construction site.

The victim H and the victim I were to perform the work of temporarily installing and coordinating the electric trains at the construction site in the vicinity of the K tunnel located in theJ from 01:30 on December 18, 2014 to 04.30 on December 18, 2014.

The work is to install electric wires with a flow of high voltage current of 25,00 V above the line. In order to prevent workers from a sense of power, the work started by inserting workers to the north side of the electric-line and the south side of the electric-line after receiving a short circuit notification at the request of the Korea Railroad Facilities Corporation to check the short circuit, and installing a contact between the north side of the electric-line and the south side. At the same time, the work was completed and the workers were removed at the same time when they were absent at the site and at the same time at the site, it was required to make a sudden cell line request on the side of the Korea Railroad Facilities Corporation. The L, designated as the work manager, was under overall supervision and supervision of the construction work, such as prior consultation, installation of a contact site, commencement and completion of the work, tamping, removal of a site, and a sudden prior consultation.

In addition, since the above construction site was wide, the construction officer notified the work situation through wireless communication and received the work instruction.

In such cases, the head of the work management team who manages and supervises the on-site work of workers shall verify that workers have completed work and have left the site safely, notify L workers of the completion of the work, and the person in charge of electrical safety management shall remove the contact from the above L, remove the contact, and supply electricity by requesting the Korea Railroad Facilities Corporation to provide an electricity cell operation.