(영문) 서울중앙지방법원 2020.11.26 2017가합512387
하자보수금 등
Text

The defendant shall pay to the plaintiff KRW 134,565,045 as well as 5% per annum from March 7, 2017 to November 26, 2020, and the following.

Reasons

Basic Facts

The status of the parties is an autonomous management organization that consists of occupants in order to manage A apartment (hereinafter referred to as “the apartment of this case”) 321 households in Si-Stitu City.

2) Defendant (the Public Official Pension Management Corporation changed its trade name on January 8, 2010)

(1) The Defendant Intervenor B (hereinafter “ Intervenor B”) is the project undertaker who newly constructed and sold the instant apartment.

(1) The Defendant’s Intervenor C Co., Ltd. (hereinafter “ Intervenor C”) is a new contractor for the construction of the instant apartment by being awarded a contract with the Defendant for the new construction of the instant apartment. When the Intervenor B and the Intervenor C are collectively named, the Intervenor’s “the Intervenor” is deemed to be the same.

A) The instant apartment construction is a company that built a fire door on a subcontract for the construction of the instant apartment. The fire doors of the instant apartment and the instant apartment that had the appraisal process, are the fire doors of the size as indicated below (the Class A fire doors; hereinafter referred to as the “instant fire doors”).

There are 729 parts. There are 729 parts. The size and quantity of the separate location is 34A fSD1,00 x 2,200 321 test 2,200 321 (2 2 bit 900) escape space FWD (extension) 900 x 2,350 321 test 2,321 (1 2,100 x 90 x 2,100) the roof floor of the primary 350 321 test 4 PIT entrance 4 PIT3 (2,100 x 1,80 x 2,100 x 1,80 x 1,00 x 2,100) the total appraiser E (hereinafter referred to as “ appraiser E”).

) In accordance with the parties’ application for appraisal and agreement, the door door test body (hereinafter “instant door test body”) shall include 4 entrance doors, 2 shelters in the shelter space, and 8 fire doors in the stairs room, as described in the above table, among the fire doors in this case, as indicated in the above table.

After confirmation, the performance test (hereinafter referred to as "performance test") is conducted by applying the KSF 22268-1 (Method of fireproofizing fire doors) and the KSF 2846 (Annual test method of fire doors) to the test body of the instant fire doors from July 24, 2019 to July 25, 2019.