1. The plaintiff's appeal is dismissed.
2. The costs of appeal shall be borne by the Plaintiff, including the part arising from the supplementary participation.
Reasons
Details of the disposition
On October 20, 2005, the Intervenor joining the Defendant (hereinafter referred to as the “Supplementary Intervenor”) registered livestock breeding business under the Livestock Industry Act on the ground of D and 7 parcels in Gunsan-si, Gunsan-si, and Do. B registered a fixed building (case branch) with the total area of eight buildings (1,223.1 square meters), 12,500 square meters of raising livestock (12,500 square meters), and C with the total area of three temporary buildings (case branch offices), 1,322 square meters of area, 15,000 square meters of raising livestock, and 15,000 square meters of temporary buildings (case branch offices), respectively.
(hereinafter referred to as “existing livestock shed” at the time of registration of livestock breeding business. On November 16, 2009, the existing livestock shed was located within the area where livestock raising is restricted, in accordance with the enforcement of the former Ordinance on the Restriction of Livestock Raising of Gunsan-si (Ordinance No. 895, hereinafter referred to as the “Gu Ordinance on Gunsan-si”) on November 16, 2009.
보조참가인들은 2012년부터 2013년경 사이에 기존 축사를 현대화하여 무창(無窓) 계사로 변경하는 공사를 시행하였다.
As a result, the location and area of the existing livestock shed and the villa have changed, and the office of the livestock shed, power generation room, compost, and management company has been newly built.
(hereinafter “instant livestock shed.” On April 1, 2014, the Defendant filed a complaint with the police on the grounds that the Intervenor was not subject to a construction permit on the existing livestock shed site and did not file a report on livestock excreta discharge facilities (hereinafter “waste discharge facilities”). The Defendant imposed a non-performance penalty on the Intervenor on the grounds of the violation of the Building Act.
The 1st floor, extended on September 30, 2012, the 1st floor steel pipe, the steel pipe, the steel pipe, and the 1st floor of which is extended on September 2, 2014, extended on September 2, 2014, 144 square meters and 144 square meters, extended on September 30, 2012. The 1st floor steel pipe, the steel pipe shed, the steel pipe, the steel pipe, and the 144 square meters of the site location of a building site located in Dosan-si, B, Dosan-si, and three lots of land, the illegal construction of Article 11 (Building Permits) of the Building Act, and the 1,162 square meters of the 1,225 square meters of a building site.