(영문) 대구지방법원 2015.04.30 2014나304557
보험금
Text

1. The plaintiffs' appeal is dismissed.

2. The costs of appeal are assessed against the Plaintiffs.

Purport of claim and appeal

The first instance court.

Reasons

1. Basic facts

A. On July 6, 200, the Defendant (U.S.) concluded a traffic safety insurance contract (hereinafter “instant insurance contract”) with the network F (hereinafter “the deceased”) stating that “the insured and the beneficiary (the deceased: statutory heir), the insurance period of 20 years, and KRW 100,000,000, when the insured died due to a traffic accident during the use of public transportation, and KRW 50,000,000,000, when the insured died due to a traffic accident other than a traffic accident during the use of public transportation (hereinafter “the instant insurance contract”).

B. Article 10(1) of the instant Insurance Clause provides for “traffic accidents that occur while the insured on board a public transportation institution operating, traffic accidents that occur while the insured gets on or off a public transportation institution for the purpose of using the public transportation institution, and accidents that occur while the insured is on the platform of the public transportation institution having the opening space for the purpose of using the public transportation institution” as “traffic accidents during the use of public transportation.”

C. At around 12:45 on February 15, 2013, the Deceased, who prescribed to be administered in the blood species department of the Gyeongbuk University Hospital, was diagnosed with a self-contestation of the stiopathrocy in the Gyeongbuk University Hospital in around 2006 (hereinafter “ITP”). From March 1, 2011 to May 3, 201, the Deceased was diagnosed with a stiopathrocy in the stimulation of the stimulation of the stimulation of the stimulation of the stimulation of the stimulation of the stimulation of the stimulsa and used them once every two days.

In order to obtain B, a bus was moved from a bus terminal located in Sungju-gun G to the left-hand side in the direction of the bus's progress, and the bridge was unfolded on the bridge. At the time of the bus's arrival, the part on the left-hand side of the bus's paper where the bridge was passed and the part on the right-hand side of the bus's paper, and then the brush, the right-hand side light, the non-permanentized brush, the right-hand side 1, 2.

arrow