(영문) 서울중앙지방법원 2019.07.23 2017가합552217
구상금
Text

1. The Defendant: (a) KRW 396,458,814 to the Plaintiff; and (b) KRW 5% per annum from June 15, 2017 to July 23, 2019 to the Plaintiff.

Reasons

1. Basic facts

A. The parties 1) The defendant is the defendant's 969.73m2 (hereinafter "the defendant's factory") of the steel-frame panel roof located in Gyeongbuk-gun, Gyeongbuk-gun, Gyeongbuk-gun.

(E) is the owner of the above plant, who is engaged in textile processing (influence manufacturing) with the trade name of D, and is E (hereinafter referred to as “E”).

(2) The Defendant Company: (a) 1st floor A, 1251.07m2, B, 201.76m2, C, 304.7m2, 304.7m2, on the ground of the steel-frame panel roof adjacent to the Defendant factory (hereinafter “instant factory”).

(2) The Plaintiff is an insurance company that has entered into a “F” contract that guarantees fire insurance for part of the instant plant (hereinafter “instant insurance contract”) with E.

B. The content of the instant insurance contract is as follows.

Insured: E insurance period: From July 13, 2012 to July 13, 2017, the current status of the subject matter of insurance and the subject matter of the insurance coverage concerned, 1,322 square meters in the steel framed Group outside the steel framed Group in the pertinent building (won) and one story on the ground (the subject matter of the instant insurance contract is operated among the factories, and B and C are not the subject matter of the instant insurance contract with non-permission extension) 500,000,000, 200 2 machinery 1 in the number of 200,000,000 and 200,000,000 movable property in the number of 3 movable property 1 in the number of 20,100,000,000 in total;

1. The name of pledgee: The current branch office of the G Bank (right of 500,000,000 won);

2. The name of pledgee: The branch office of the G Bank Freeboard Corporation (Pledge amounting to 400,000,000).

C. On February 23, 2017, around 06:08, a fire occurred at the Defendant factory where the fire occurred (hereinafter “instant fire”) and the machinery and corporeal movables in the instant factory, which are adjacent to the said factory, were destroyed by fire.

On June 12, 2017, the Plaintiff paid KRW 200,000 to E with the fire insurance money of this case, and KRW 812,182,112 to G Bank, a pledgee, KRW 1,012.

(e) E in a lawsuit seeking damages against the Defendant;

arrow