(영문) 의정부지방법원 2015.01.22 2011가합14135
손해배상
Text

1. The Defendant shall pay to the Plaintiff KRW 196,027,632 as well as 20% per annum from December 8, 2011 to the date of full payment.

Reasons

. The Defendant’s official seal is entirely affixed.

2) However, in performing the construction of the first floor steel structure of each of the instant buildings among each of the instant new construction works, the instant construction works include the RH steel frame of the specifications indicated in the design drawings of the instant case as indicated below (hereinafter “instant design steel frame”).

() Other Hadem-type Hadem-based Radem-based Radem-based Radem-based Radem-based Radem-based Madem-based Madem-based Madem-based Madem-based Madem-based Madem-based Madem-based Madem-based Madem-based Madem--based Madem-based Madem--based Madem-, Madem--based Madem--based Madem-, 15 Madem--2 Madem-, 15 Madem-, 15 Madem-, 15 Madem-, 194 Madem-2 Madem-, 15 * 194 Madem-, 29 * 20 194* 296* 294* 294* 20169* 15 169* 1694*

A) On September 3, 2008, the Hun-Ba used the Plaintiff’s use of the design frame of this case as indicated in the table below, and confirmed that the design frame of this case was performed throughout the entire construction works in accordance with the construction design drawings, specifications, quality control standards, and other arrangements, and if any defects are discovered in the construction supervision and inspection, the Plaintiff requested an intermediate payment for each newly constructed construction work (the intermediate payment for each newly constructed construction work shall be immediately compensated or reconstructed, accompanied by an intermediate inspector).

Building CD E E E E 458*417*30*50 414*4050*18*18*28 414*405*18*18*28*408*21*21*408*408*21*21*408*21*21* 400*40*400*21*21*310*20*20*20 as above.