logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 서울중앙지방법원 2018.06.15 2017가합564739
구상금
Text

1. The plaintiff's claim is dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

Basic Facts

The defendant is a corporation established for the purpose of manufacturing and selling food machinery, manufacturing and selling industrial machinery, etc.

A around September 2016, around the 2016. A newly constructed a "C" factory building (hereinafter referred to as the "instant factory") at the ground of Gyeonggi-gun B.

On November 2016, the Plaintiff entered into an insurance contract as shown in the attached Form A with A.

(hereinafter “instant insurance contract”). A around October 2016, at the request of A, the Defendant installed the manufacturing machine on the first and second floors of the instant plant and installed the cooling machine for the manufacturing machine on the second floor.

On November 29, 2016, the Defendant used the electric wires purchased by the Defendant to connect the wires connected to the said cooling machine with the air roller in the cooling room through the cooling room.

At the time of the operation of the electricity construction business with the trade name of “D”, E engaged in line work to connect the above electric wires to the terminal of the control towerer at A’s request. During the specific work process, E’s employees F, who had been on the ceiling, stored the electric wires from the bottom of the ceiling to the ceiling of the ceiling, performed the installation of the electric wires in the ceiling of the ceiling (the extension of the lines by connecting the new lines to the existing lines), and E, upon receiving the said electric wires again, connected the lower control towerer.

On March 11, 2017, around 09:10, a fire occurred on the second floor of the instant factory, and the machinery, movable property, facilities, and fixtures in the instant factory and factory were destroyed by fire.

(hereinafter “instant fire.” The Plaintiff paid the insurance money based on the instant insurance contract (hereinafter “instant insurance money”) to A as follows:

On June 16, 2017, 100, 50,000 Machines 50,000,000, 130,939,198 of the building on August 29, 2017, and aggregate of 10,073,479 movable property, 2,079,350 Machines 76,689,018 [based] 369,781,045 of the value of the date damage item, there is no dispute over the 369,781,045 of the aggregate of 10,00,000,000,000,000,000,00,000.

arrow