logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 광주지방법원순천지원 2019.05.09 2018가합11634
건물명도(인도)
Text

1. The Defendant-Counterclaim Plaintiff (Counterclaim Defendant) is not less than 912m2m2 in netcheon-si:

(a) an indication of the attached drawing(s)(a), (i), (k), and (k);

Reasons

1. Facts of recognition;

A. The Plaintiff is the owner of D 912 square meters in 1,000,000 square meters (hereinafter “instant land”).

B. Around May 2007, the Plaintiff leased the instant land to Defendant B for five years from May 207 to May 20, 2012, the lease deposit amount of KRW 5 million, the rent monthly, and the lease period of KRW 500,000 from May 20, 2007 to May 20, 2012.

On May 2012, the above lease agreement changed the rent of KRW 1 million per month, and the remainder was renewed with the same content. Defendant B paid KRW 1 million per month to the Plaintiff from that time until June 20, 2017.

C. Under the above lease agreement, Defendant B shall display drawings on the land of this case, construct the existing building of this case and expand the surrounding building, etc., and connect each point of the (1) part of the land of this case, which connects the above points of Section A, B, B, C, D, A, and D, in order to connect the above points of Section B, C, C, C, D, D, and D, and office 156.96 square meters (hereinafter “the building of this case”), display of drawings, ma, f, g, g, g, g, g, g, g, g, g, g, Ga, and Ma, and 79.8 square meters in order of the above lease agreement (hereinafter “the building of this case 2”), display of drawings, g., g., g., g., g., g., g., g., g., g., g., g., g., and g., g., g., 34 of ground assembly type.

arrow