Defendant

A and Defendant C shall be punished by a fine of 5,00,000 won, and Defendant B shall be punished by a fine of 2,000,000 won.

Reasons

Punishment of the crime

[B] F Co., Ltd. is a business owner who performs a construction work of H apartment in Pyeongtaek-si G by being awarded a contract with the ordering Military Mutual Aid Association, and I is a person in charge of safety management as the head of the site office of the said apartment construction.

F Co., Ltd. subcontracted part of the above apartment construction to Defendant C Co., Ltd., and Defendant C Co., Ltd. is the owner of the above reinforced concrete construction, Defendant A is the safety manager as the site manager of the above reinforced concrete construction, and Defendant B is the safety manager as the deputy head of the above reinforced concrete construction.

【Criminal Facts】

1. Defendant A and Defendants B directed the Victim J(48 years of age) and the Victim K(46 years of age) to perform an electric installation work at the same construction site around December 31, 2013, which was scheduled on January 2, 2014, for the purpose of removing concrete from the electric room, and managed and supervised the aforementioned electric room in advance.

In order to build concrete studio, reinforcement work for studio house installed in the above wall should be carried out in advance so that the party can check the side pressure generated in the new wall. At this point, there is an excellent tank that shares one wall with the above electricity room, so it is necessary to reinforce the studio for the excellent inside wall as well as the inside wall of the electricity room. Therefore, the defendants could expect the victims to proceed with the reinforcement work for the excellent inside wall during the process of arranging the electricity room in advance.

However, from December 29, 2013 to December 18, 2013, the foregoing excellent Article was 14 out of a large amount of calculiccarbon emissions to prevent heat emissions. In order to prevent high calculic emission, it was sealed with a cover over the outside of the calculic.

Therefore, when managing and supervising the above-mentioned sealed space work, the air situation prior to the commencement of work to prevent the risks of workers.