logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 청주지방법원 2014.05.08 2012구합1827
산업단지의 지정 및 산업단지계획 승인 처분 취소
Text

1. All of the plaintiff's claims are dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

1. Details of the disposition;

A. On October 22, 2008, I Co., Ltd. established an intervenor company assisting the Defendant, and on November 14, 201, filed an application with the Defendant for approval of an industrial complex plan with the project operator as the intervenor assisting the Defendant in order to create an industrial complex (hereinafter “instant industrial complex”) on the ground of Chungcheongbuk-do petitioner C, D, large scale 548,66 square meters, 201. On May 25, 2012, the Defendant approved and publicly announced the instant industrial complex plan with the following content:

(J) Cheongbuk-do, hereinafter referred to as the “instant Disposition”). - A.I.D.

1. Name of industrial complex: Petition E industrial complex;

2. To construct an industrial complex in order to contribute to the strengthening of industrial competitiveness of petition groups and the activation of the regional economy in connection with neighboring industrial complexes, such as the 12 industrial complex and the rooftop industrial complex, by performing the role of policy to foster the research base of the industrial complex and the necessity IT industry, by attracting high-tech industries for growth power of next generation in North Korea, and by securing industrial support functions.

3. Location and area of the designated area;

(a) Location of an industrial complex: The petitioner C and D of Chungcheongbuk-do;

(b) Area of an industrial complex: 548,66 square meters;

(a) Period: From 2012 to 2014;

(b) Methods of development: Private development;

5. Main types of business;

(a) The business of manufacturing metal and processed products of other manufacturing industries, pulp, paper and paper products, which are classified into types of major types of business to be invited: the business of manufacturing machinery and furniture excluded from machinery and furniture, the business of manufacturing new materials biotechnology (BT) chemicals, and the business of manufacturing new materials (NT) chemical products, electronic information and communication (IT), computer, image, sound and telecommunications equipment manufacturing business, and other business of manufacturing machinery and equipment, machinery, machinery, machinery merts, precision, optical, optical and clock manufacturing business (MT), and the business of manufacturing machinery and equipment, and other business of manufacturing machinery and equipment;

(b) A total of 343,160 100 of the installation cost (%) of the allocation plan of the type of business to be invited, and other manufacturing sector 115,17 March 17, 963;

arrow