logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 인천지방법원 2019.01.31 2018가단232095
건물명도 등
Text

1. The defendant attached to the plaintiff

1. Of indicated buildings:

A. Attached Form

2. Labelling 4, 5, 6, 7, 8, 9, 4-4.

Reasons

1. Determination on the cause of the claim

A. 1) The Plaintiff’s claim for extradition 1) Attached from C on July 5, 2004

1. Purchasing an indicated building (hereinafter “instant building”) and its site, and received the registration of ownership transfer on July 8, 2004.

B) The Plaintiff: (a) from August 2004 to December 2004, 2004, performed remodeling construction for the instant building; (b) the Defendant managed and supervised remodeling construction upon the Plaintiff’s delegation; (c) the Plaintiff faithfully performed management and supervision around December 2004 to the Defendant.

2. On the ship that connects each point of Nos. 1 (O.S.) Nos. 4, 5, 6, 7, 8, 9, and 4 in sequence, the ship’s office was permitted to use the part of 14.6 square meters (hereinafter “the unit part of the rooftop”) free of charge, and the delivery was made. The Defendant, without the Plaintiff’s permission, without permission.

2. The attached Form 1 1 2, 2, 3, 4, 9, 8, 7, and 1 each point in sequence connected to each point of 1, 2, 3, 4, 9, 8, 7, and 18.8 square meters in the stairs room (hereinafter referred to as “househouse 2”).

3. The part of the warehouse (hereinafter “the underground part”) that connects each point of 1, 2, 3, 4, and 1 in sequence is occupied and used by the captain of the ship (hereinafter “the underground part”).

E) Of the instant building, the Defendant neglected waste materials to the rooftop and the section for common use on the first floor, etc. among the instant building; the Defendant received a request for delivery of the part occupied by the Plaintiff and the removal of waste materials from D; and on April 18, 2018, the Defendant submitted a confirmation letter from D on October 18, 2018 (No. 7 No. 2); “I do so; I do so; I do not do so; I do so, the Plaintiff submitted a confirmation letter from the Plaintiff on October 28, 2018, that “I do not have any waste materials. I do not dispose of, and do so. I do so, she will do so, she she she she she and she she she she and she she she she and she she she she she she and she she she she she she and she she she she she she she she and she she she she she she....

arrow