logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 의정부지방법원고양지원 2019.11.29 2018가단91915
소유권이전등기
Text

1. The plaintiff's claim is dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

In fact, on August 6, 1997, the Corporation acquired the land listed in Annex 1 List No. 2, the land listed in Annex 1 List No. 1, August 16, 1997, the land listed in Annex 1 List No. 1, August 21, 1997, and the land listed in Annex 1 List No. 3 (hereinafter collectively referred to as “each land of this case”) through consultation, and completed each registration of ownership transfer on the ground of this on August 27, 1997.

Each of the instant lands was comprehensively transferred to the Republic of Korea on December 16, 2005 (Ministry of Construction and Transportation). Under the Framework Act on Railroad Industry Development, the Defendant was invested in kind on July 5, 2006, and the Defendant completed the registration of ownership transfer based on this date on August 29, 2006.

At present, among the land listed in paragraph (1) of the attached Table 1, a road is installed on each ground of 102 square meters from among the land listed in the attached Table 2, which connects each point of 13, 2, 3, 15, 11 through 13 in sequence among the land listed in the attached Table 2, and of 276 square meters from among the land listed in the attached Table 1 list 2, which connects each point of 241 square meters in sequence, and of 15, 3, 4, 18, 9, 10, 15 among the land listed in the attached Table 1 list 2, 276 square meters in sequence, and 276 square meters in part of 18, 4, 8, and 18 of 2

(In general, each part of the above is referred to as "road section of this case." The dispute part of this case is the remaining part of each land except the road part of this case.

[Grounds for recognition] The facts without dispute, Gap evidence Nos. 7 (including a paper number; hereinafter the same shall apply), Eul evidence Nos. 1 through 8, and Eul evidence Nos. 12 through 14, and the fact-finding to the Minister of Land, Infrastructure and Transport of this Court, as a result of the request for surveying and appraisal to the Korea Land Information Corporation of this Court, the plaintiff filed a request for the entire purport of pleading with the plaintiff operated a wood station on the part of the dispute of this case and neighboring land before before 197, which acquired the ownership of each of the land of this case, and Eul constructed a road on the road of this case around that time. The road of this case is part of the road of this case.

arrow