Text
Defendant shall be punished by a fine of KRW 15,000,000.
When the defendant does not pay the above fine, 100,000 won.
Reasons
Punishment of the crime
1. A person who intends to construct or repair a building in violation of the Building Act on December 2, 2011 shall obtain permission from the Special Self-Governing City Mayor, a branch office of a Special Self-Governing Province, or the head of a Si
Nevertheless, the Defendant, in collusion with C on December 2, 201, constructed a building of a steel-frame structure with the floor area of 159.89 square meters on the ground level, without permission, in order to create a passage through which equipment, such as for having cars, etc., in the freezing warehouse installed in D, can be moved.
2. A person who intends to construct a building, install a structure, or alter the form or quality of land by altering any violation of the National Land Planning and Utilization Act, from the first patrol officer to the first patrol officer from June 2015, 2016, shall obtain permission from the Special Metropolitan City Mayor, a Metropolitan City Mayor, a Metropolitan Autonomous City Mayor, a Special Self-Governing Province Mayor, or a head of a Si/Gun.
Although the Defendant obtained permission to engage in development activities to install electric marry and reverse L retaining wall structure with respect to the land outside E, the Defendant installed a retaining wall and a concrete marbing structure equivalent to 509.58mm27m2, different from the details of permission from the first patrol officer on June 2015 to the first patrol officer on April 2016, and changed the form and quality of land equivalent to 605m25m2 in total.
3. A person who intends to construct a building, install structures, or change the form or quality of land in violation of the Act on the Planning and Utilization of National Land on March 2016 shall obtain permission from the Special Metropolitan City Mayor, Metropolitan City Mayors, Metropolitan Autonomous City Mayors, or Special Self-Governing Province heads of Sis/Guns.
Nevertheless, on March 2016, the Defendant, without permission, installed concrete string structures in the area of about 3,000 square meters, which is equivalent to 3,000 square meters outside of 200 square meters, and changed the form and quality of land by packing concrete roads.
Summary of Evidence
1. Written accusation concerning the preparation of the police interrogation protocol in relation to the defendant's legal statement C, a copy of the written application for construction, substantial repair, or modification of the purpose of use of the criminal defendant's written accusation.