(영문) 부산고등법원 2018.08.22 2017나58116
물품대금
Text

1. The plaintiff's appeal is dismissed.

2. The costs of appeal shall be borne by the Plaintiff.

The purport of the claim and appeal is the purport of the appeal.

Reasons

Basic Facts

The Plaintiff is running the safety equipment distribution business with the trade name “D”.

On March 21, 2016, the Defendant publicly announced the tender (hereinafter “instant tender announcement”) on the structure and equipment for measurement (two radiation measuring apparatuses, two gas leakage detection apparatuses, and two gas leakage detection apparatuses) (hereinafter “the instant tender announcement”).

Notice of Public Notice of Purchase of Goods (emergency)

1. Matters referred to the tender;

(a) Purchasing goods: Structures and equipment for measurement (Class II four points);

(b) Delivery place: The fire headquarters of the B local government;

(c) Delivery period: 70 days from the contract date;

(d) Basic amount: The current status of purchased goods (including value-added tax) of gold 332,476,00 won: The item for each classification of structure and equipment for measurement purpose, the quantity of name for each structure and equipment, and 2 specifications of the nuclear radiation measuring machine for the measurement of structure and equipment, see 2 specifications of the nuclear radiation measuring machine for the measurement of structure and equipment, see 332,476,000 won;

6.The delivery of the recommendations for this contract may be made if they are products of performance equal to or higher than the specifications of the specifications of the specifications of the specifications attached to the products which are supplied. 7. The delivery of these contracts shall be made by the contractor if they are products of performance (the evidence specifying the purpose, performance, etc. shall be presented by the contractor).

8. The contractor shall furnish the following documents to the demanding administrative agency not later than seven days before the delivery:

- Part 1 of the list of goods registration numbers granted from the Public Procurement Service for each item (equipment) - One copy of the report of a domestic or foreign authorized agency, one copy of the certificate, one copy of the document evidencing import of goods (limited to imported goods) - one copy of the certificate issued by an enterprise (in the case of manufacture or import, domestic agency) with authority to handle goods free of charge or at a cost (A/S), and one copy of the certificate issued by the enterprise (in the case of manufacture or import, domestic agency) with authority to handle goods;

1.The scope of the application shall apply to the equipment inspected on a real-time basis on whether gas flows out using a special out-of-the-spot strike.

2.Woo 2.2.Wood gas Modon

arrow