1. The plaintiff's claim is dismissed.
2. The costs of lawsuit shall be borne by the Plaintiff.
Reasons
1. Special conditions of a contract for the production, replacement, and processing of aggregate based on the facts;
1. On-site name of the production site: The name of the type of work at the construction site at the construction site at the time of the plaintiff's old-undong site: Aggregate production and sale period: The location at the site from July 2014 to June 2018: Gumi;
2. General support items 1) The Plaintiff’s lease of the site and site preparation (except for basic civil engineering works, etc. at the time of construction of machinery) with respect to site lease and site preparation works. ② The production of aggregate and all other matters authorized and permitted (such as permission for piling up aggregate, reporting on crushing aggregate, reporting on dust dust, reporting on emission of wastewater, reporting on noise and vibration, etc.) shall have the Plaintiff take administrative measures. ③ The environmental management Plaintiff installs soundproof and dust-proof walls to prevent dust and noise and vibration, and installs an automatic washing wheel at the static door door, and operates one string car at all times. ⑤ The Plaintiff’s performance of the above-mentioned rent for the supply of raw tin, such as securing of raw tin and shipping of products, transportation of raw tin out of barracks (except for construction of machinery) to the Plaintiff, the Defendant’s installation of aggregate tin-processing and tin-processing facilities at the time of transport of aggregate tin in barracks, and the Defendant’s installation of aggregate tin-making and tin-processing facilities directly to the Plaintiff.
3. Production management 3) Environmental management (3) After the completion of daily work, the defendant must conduct cleaning and rearrangements inside and outside the site. (Civil petitions related to production shall be treated by the defendant, and civil petitions arising from the entry of the original stone into and the shipment of the products shall be treated by the plaintiff.
Expenses incurred in supplementing civil petition-related facilities and village support.