(영문) 대구지방법원 김천지원 2018.11.02 2018가합15195
물품대금
Text

1. The Defendant’s KRW 643,877,655 as well as its related KRW 6% per annum from December 8, 2017 to November 2, 2018, and the following.

Reasons

1. Special conditions of a contract for the production, replacement, and processing of aggregate based on the facts;

1. On-site name of a production site summary: The name of a type of work at the old and US C site: The production and sale period of aggregate: The location of the site from July, 2014 to June, 2018: the old and US D;

2. General support items 1) Defendant’s lease of the site and site preparation (except for basic civil engineering works, etc. at the time of construction of machinery). (2) The production of aggregate and all other matters authorized and permitted (such as permission for piling up aggregate, reporting on crushing aggregate, reporting on dust dust, reporting on emission of wastewater, reporting on noise and vibration, etc.) shall be made administrative treatment by the Defendant. (3) Environmental management Defendant installs soundproof and dust-proof walls to prevent dust and noise and vibration, and installs an automatic washing machine at the static door door, and operates one string car at all times. ⑤ The Plaintiff’s performance of the rent for the supply of raw tin, such as securing of raw tin and shipping of products, transportation of raw tin outside the barracks (except for construction of machinery) to the Defendant, the Plaintiff’s performance of tin’s installation and management of aggregate by-products after loading aggregate to the Defendant, and the Plaintiff’s performance of tin’s installation and management of aggregate by-products, etc. to the extent that it does not have an atmosphere time for loading tin.

3. Production management 3) Environmental management (3) The plaintiff must conduct cleaning and rearrangement in and out of the site after the completion of daily work. (Civil petitions related to production shall be treated by the plaintiff, and civil petitions arising from the entry of the raw stone into and the shipment of the products shall be treated by the defendant.

Expenses incurred in supplementing civil petition-related facilities and village support.