(영문) 인천지방법원 부천지원 2018.12.19 2018가합102330
공사대금
Text

1. The Defendant-Counterclaim Defendant-Counterclaim Plaintiff (Counterclaim Plaintiff)’s KRW 106,789,00, the Defendant-Counterclaim Plaintiff’s KRW 87,429,00, and the Defendant-Counterclaim Plaintiff’s KRW 829,00.

Reasons

Basic facts and counterclaims are also considered as the main claim and counterclaims.

Defendant B, as each owner of the real estate listed in the separate sheet Nos. 1 and 2, the real estate listed in the separate sheet No. 3, and the real estate listed in the separate sheet No. 4, the Defendant D prepared a contract for each construction work as follows with respect to the civil construction work for site creation on the ground of each real estate listed in the separate sheet No. 1 (hereinafter “each of the instant land”) (hereinafter “each of the instant land”) as the contracting owner on August 7, 2013.

Defendant B

4. Contract amount: 225,200,000 won;

5. Gold part of gold: 30% of down payment: 67,560,00 won: 67,560,000 won for contract, intermediate payment 40%: 90,080,000 won for intermediate payment, and at the time of commencement of earth and sand filling or stone axis work. Balance 30%: The remainder: 60%: 67,560,000 won- the site adjustment completion/civil engineering design, the Defendant C does not have any further confirmation.

4. Contract amount: 191,300,000 won;

5. End payment: 28,695,00 won: 28,695,00 won for a contract, down payment (2j): 15%: 28,695,00 won for a contract, authorization, and intermediate payment 40% for a contract, part payment: 76,520,000 won for a contract, Section 1, and part payment for a 30% balance at the beginning of embling and embling works, 30% for a 30% balance: 57,390,000 won for a site adjustment and completion of civil engineering design. Defendant D does not have any more after the completion of the site adjustment/civil design.

4. Contract amount: seventy-two thousand won;

5. End payment: 30% of the completed payment: 21,810,00 won: 29,080,000 won in a contract, part payment 40% in an intermediate payment: 29,080,000 won in a contract, Section 30% in a case where earth and sand embling work commences, 30% in a balance: 21,810,000 won in a site and the written complaint for the design of civil engineering has not been verified, and there is no special agreement

1. The Plaintiff and the Defendant shall, when cancer occurs, such as tobacco cancer, winding cancer, and light cancer during the construction work, conduct an appropriate production by applying the government standard pumsem on cancer removal and the government standard wage, and consult on air delay and damage resulting therefrom, and shall be included and constructed in the absolute air;

3. Matters concerning the performance of construction works not specified in the drawings shall be governed by estimates and standard contracts, and matters concerning the implementation of construction works other than estimates shall be recognized as separate consultations.

On March 3, 2015, the Plaintiff from E to the Defendants of E.