(영문) 창원지방법원진주지원 2011.12.21 2010가합1541
공사대금
Text

1. As to KRW 1,152,421,592 and KRW 733,53,00 among the Plaintiff, Defendant B shall be from July 2, 2010 to December 21, 201.

Reasons

1. Facts of recognition;

A. Defendant B entered into a contract with the Plaintiff on July 18, 2008, stipulating that “E farm construction work shall be KRW 6,150,000,000 (including value added tax) for construction work, and the construction period shall be from July 30, 2008 to December 10, 2008.

The term "E farm" is "E farm", the term "construction work" is "the construction work of this case", and "the construction contract of this case" is "the construction work of this case".

The Plaintiff completed the instant construction project and obtained approval for use from the head of Si/Gun on December 18, 2008.

B. While the Plaintiff was performing the instant construction project, the amount of gold for official use within the following official buildings, which was not originally stipulated in the instant construction contract.

1. Common provisional construction works of KRW 2,797,00;

2. Civil engineering works;

(a) Access roads and stables: 35,706,000 won for civil engineering works;

(b) Basic reinforcement works: 128,238,00 won;

(c) 59,158,000 won for dynasium and sand works;

(d) Construction work of destroying the foundation for a building 21,747,000 won;

(e) Additional civil works on a site: 56,980,000 won;

3. Construction works.

(a) A temporary installation of KRW 20,850,000;

(b) Alley project: 60,234,000 won;

(c) Flood control works: 72,130,000 won;

(d) 29,113,00 won for a tent establishment work;

(e) Construction works for wastewater treatment plants: 56,188,000 won;

(f) Overseas packing works 27,925,000 won;

4. Electrical construction (change of material quality, such as power distribution box) 7,296,00 won.

5. 5,627,00 won for a connecting passage to a Dong or Dong.

6. A total of KRW 598,537,00,000, total of KRW 14,548,000 was additionally executed.

Temporary amount of KRW 1,200,000 on April 28, 2009, KRW 3,005,000 on May 11, 2009, KRW 100,000,000 on May 11, 2009, KRW 400,000 on October 1, 2009, KRW 400,000 on October 1, 2009, KRW 6,005,000 on June 30, 200,000 on February 11, 2010; and

C. The Plaintiff received KRW 6 billion out of the construction price of this case from Defendant B as follows.

In addition, Defendant B paid KRW 20,000,000 as part of the construction cost of the instant case to F, the former secretary of the Plaintiff Company, and instead, Defendant B paid KRW 10,000,000 to the Plaintiff.