(영문) 창원지방법원마산지원 2017.06.14 2016가단104121
손해배상(산)
Text

1. The Defendant: (a) KRW 103,372,446 to the Plaintiff; and (b) KRW 5% per annum from August 13, 2015 to June 14, 2017 to the Plaintiff.

Reasons

1. Occurrence of liability for damages;

A. (i) On October 27, 2014, the Plaintiff joined the Defendant Company and worked at the Ganyang City Construction Site (hereinafter “instant construction site”) which is the Defendant Company’s workplace.

around August 13, 2015, at the construction site of this case, the employees of the defendant company worked for the head of division D (field chief, general safety and health supervisor), E (general safety supervisor), director F (safety supervisor), representative G (safety supervisor), and senior plaintiff (safety supervisor).

Article 22(1) of the Civil Code No. 1 of the Civil Code No. 3048, Apr. 1, 2015 (hereinafter referred to as the “instant passage”) provides that “A person who is the chief of the vision team at the construction site of the instant case shall be ordered to install a passage to move from E or F to the workplace of early construction work, and under the management of the Plaintiff who was in charge of early construction work, his or her husband installed the passage (hereinafter referred to as the “instant passage”).

Then, the passage of this case is a bridge form connecting the steering construction work site and the entrance of a passage. At the entrance of the passage, the passage of this case connects the passage to the pipe (on the left part), and installed several non-development plates in the rectangular shape on the road. It was difficult to install work, etc. on the left part of the non-development plate, but the right part was anchored on the pipe, but the right part was not fixed, and the safety net was not installed on the two side of the passage, and there was no safety net against the fall.

(v) On August 13, 2015, at around 09:50, the Plaintiff entered the instant passage to the shipbuilding work site along with the figures, and returned from the instant passage through the instant passage, the Plaintiff took part outside the pipe from among the non-development plates of the instant passage, lost the center, fell below approximately seven meters, and fell below the center.

arrow