(영문) 청주지방법원충주지원 2020.11.04 2019가단20248
통행권확인 등
Text

1. The plaintiff

A. Defendant B: (a) indicated in the attached Form No. 98-102, 131-13, and 98 among the area of 28 square meters prior to Gangseo-gun D, Gangwon-gun.

Reasons

1. Basic facts

A. The Plaintiff and Non-Party Ha Co., Ltd. (hereinafter “H”) owned 278m2, J Forest and J Forest, 1,694m2, 105m2, 23,679m2 before M, 11,69m2, 1451m2 before N, 8,934m2 before Q, 927m2 before R, 325m2 before R, 195m2, 232m2, 5m2, 85m2, 196, and 321m2 (hereinafter “Plaintiff-owned land”), 222,000,51, 967m2, and 2967m2 before the Plaintiff owned the adjacent land. The Defendants owned shares of G27m2 and 17m2, 1967m2, and 107m2 and 37m2, respectively, on each of the following grounds.

(hereinafter referred to as “the adjoining land of this case”). The detailed status of the Plaintiff’s land and the adjoining land of this case are as the drawing of additional appraisal.

B. The Plaintiff owns solar power generation facilities on the ground of the Gangwon-gu Military M, P, W, Y, Z, and AA (hereinafter “instant solar power generation facilities”), and operates solar energy projects. The specific status of solar power generation facilities of the instant case is as shown in the annexed drawings.

C. Meanwhile, on November 27, 2012, AB, the representative director of the Plaintiff, was divided into I or L on June 1, 2015, between H (the trade name before the change: AC) and the non-party AD, the husband of the Defendant C, and on June 1, 2015, between the 26,211 square meters of the KaE in Gangwon-gun AE in Gangwon-gu, Gangwon-do, Gangwon-do, and again, on June 15, 2015, the 11,697 square meters of the 11,697 square meters was changed to the Ma in the Young-gun, Gangwon-gu, Gangwon-do, Seoul-do.

A. Of the total area of 51,697 square meters, an agreement was concluded to construct “AF solar power plant” on the ground of 21,619 square meters (hereinafter “instant agreement”). The main contents of the agreement are as follows: (a) the project area: (b) the 21,619 square meters AE area of the 51,967 square meters in Young-gun, Young-gun, Gangwon-do, and the AB corporation (hereinafter “B”) on November 27, 2012.