logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 서울중앙지방법원 2018.02.14 2017가단5059068
손해배상(자)
Text

1. As to the Plaintiff A’s KRW 28,032,667, Plaintiff B, C, and D respectively, KRW 16,595,173 and each of the said money.

Reasons

1. Facts of recognition;

A. The Defendant was awarded a subcontract for F, G high-priced packing improvement works and replacement works with a protective fence by the Seoul Special Metropolitan City Facility Management Corporation, and H is the field agent of the said construction.

B. H around September 22, 2015, around 04:11, G high school repair and improvement works were conducted in order to prevent the 1,2-lanes of the roads in Gangnam-gu Seoul Metropolitan City I Do from among the third roads.

In order to reduce the speed of ordinary vehicles, a speed limit sign of 400 meters prior to the starting point of the construction site shall be installed at the construction site in order to prevent an accident between ordinary vehicles or with a construction vehicle entering the construction site at a rapid speed of 80km at the time, and thus, the person in charge of safety management at the construction site shall post signal numbers at the construction site in accordance with the safety management plan, and shall induce signal numbers to drive or reduce the speed of ordinary vehicles at the construction site at a fixed location. In order to reduce the speed of ordinary vehicles, a speed limit sign of 60km at each hour at a speed of 400 meters prior to the starting point of the construction site, 200 meters prior to the construction site, 60 meters prior to the beginning point of the construction site, and in order to prevent an accident between ordinary vehicles or with a construction vehicle entering the construction site, it is necessary to install a signboard at a speed of 300 meters prior to the construction site at a speed of 20 meters prior to the construction site to reduce the speed of the general vehicle.

Nevertheless, H neglected this and allowed two of signal numbers to carry out other work than vehicle guidance and speed reduction, and did not have a construction guide and speed limitation sign properly, and changed section and section.

arrow