logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 부산지방법원 2014.12.11 2014가합42489
구상금
Text

1. As to the Plaintiff KRW 174,468,794 and its KRW 9,865,930 among them, the Defendant shall pay to the Plaintiff KRW 174,468,794 from March 22, 2014, and KRW 164,602,864.

Reasons

1. Basic facts

A. The Plaintiff is a mutual aid business entity that entered into a mutual aid agreement with A and B cab (hereinafter “victim”), and the Defendant is an insurer that entered into a comprehensive motor vehicle insurance contract with C with D (hereinafter “NPC”).

B. On December 24, 2013, C of the instant accident: (a) driven by a sea-going vehicle on a December 24, 2013, while driving a two-lane road in front of the F-lane E in Changwon-si, Changwon-si, with one-lane from the area of the land-head square to G bank; (b) by negligence entering the intersection in violation of the signal signal while driving from the area of the land-head square to G bank; and (c) operated by A to the area of the new tourist construction project in H bank under the new subparagraph, and driven by A to the front part of the damaged vehicle.

(hereinafter referred to as “instant primary accident”). After the instant primary accident, the damaged vehicle received the props of the traffic signs, such as the streetlight on the road in Fancy (hereinafter referred to as “instant traffic signs”).

(hereinafter “the instant secondary accident”). The instant primary accident and the instant secondary accident are collectively referred to as “the instant accident”).

As a result of the instant accident, I died as a result of the instant accident, which was accompanied by the lower seat of the said taxi, and the damaged vehicle owned by A was cut off, and the traffic signs of this case were also damaged.

(1) On February 3, 2014, the Plaintiff paid KRW 6,260,00 to the heir of A, who received KRW 1,103,070 for the remaining property value on the 12th of the same month, and paid KRW 419,00 for towing expenses, etc. on the 13th of the same month to the heir of A, and on March 21, 2014, the Plaintiff paid KRW 4,290,00 for the restoration of the traffic signs in this case to the heir of A, who is the work executor, and paid KRW 9,865,930 for the damages of A (i.e., KRW 6,260,00 for the damages of the instant transport signs (= KRW 1,103,070 for KRW 419,00 for the 1,290,290,000 for the 1,290,000 for funeral expenses, etc.).

arrow