(영문) 서울고등법원 2015.06.25 2014누8058
시정명령등취소
Text

1. The Defendant’s corrective measures and corrective measures indicated in attached Form 1, as the Defendant’s Decision No. 2014-226, against the Plaintiff on October 7, 2014.

Reasons

1. Basic facts and circumstances of dispositions;

A. The status and current status of the Plaintiff, etc., Samsung C&T, and Hyundai Construction Co., Ltd. (hereinafter both of them are “Plaintiff, etc.,” and individually, “Plaintiff,” “T&T,” “T&T,” and “N&T,” respectively.

Plaintiff

The general status of the following table shall be as follows:

2011 201 201 201 201 2012 804,332 28,433,401 43,302 409,080 465,411 266,372 8,714, 255,000 9,565,758 407,451 407,051 94,058 94, 961 27,347,676,789 557,273,273,938,938,287 792,8792,870 686,566,960,644,6362 (2013 unit, 200, 2000 won)

B. The main contents of the construction project for expanding the drainage of the Nakdong River basin (a summary of the construction project) are the construction project for expanding the drainage of the Nakdong River basin (hereinafter “instant construction project”) that is part of the construction project for the purpose of flood prevention, securing water resources, improving water quality, etc., and installing six additional drainages on the ten drainages installed in the existing Nakdong River basin.

On July 10, 2009, the Korea Water Resources Corporation ordered the instant construction project, which is the agency awarding the contract for the construction project, with six copies of major drainage of the construction works of the Korea Water Resources Corporation, one bridge for traffic, and one thousand and one hundred and thirty days from the beginning date of the construction project period for the 1,130-day project for supplementary facilities (design 60%, price 40%), which is the standard weight in the method of selecting successful bidder for the construction project and the method of selecting successful bidder for the construction project at the construction site, which is 21,70,000,000 won (including value-added tax) in budget amount. The outline is as follows.

Therefore, if the ordering party presents only the master plan for the construction project and the bid guidance, the tender will be made.