Text
1. The Defendant’s KRW 162,317,205 as well as 5% per annum from March 29, 2018 to December 17, 2019 to the Plaintiff.
Reasons
1. Basic facts
A. D fishery partnership corporation established by the husband C, etc. of the B (hereinafter “victim”) established a fish plantation (hereinafter “the fish plantation in this case”) with the area of 6,049.69m of water size on the ground of the land outside the territory of 3,04,00,049.69m of the area of which is 6,759m (the area of the facility) on the land of the land of the land located outside the territory of the former Heung-gun-gun, Seoul Special Metropolitan City. On August 21, 2002, D fishery partnership started fish farming, such as a
B. Upon the commencement of the voluntary auction procedure on the instant aquaculture building and its site to the Gwangju District Court F, on March 23, 2010, G and H sold them to G and H, around April 2010, C continued sea farming, after setting the lease period from G to April 1, 201, from April 1, 2010 to April 30, 201, the instant aquaculture facility was leased at KRW 50 million for the rent year (hereinafter “instant lease agreement”).
C. With respect to the instant aquaculture facilities, the victim obtained permission for cultivation of inland sea water on April 4, 201, and permission for seed production fisheries on April 11, 201, and the victim completed business registration (the type of business: business: business fishing, issues style, and seeds production) with the trade name called "J" on April 6, 201, when the location of Jeonnam-gun I, which is the location of the instant aquaculture facility, was located.
On December 15, 2001, the Defendant established and publicly announced a master plan to develop L in the Jeonjin-gun Kwon, Gangnam-gun, and publicly announced the implementation plan for L construction works with the following major contents as the M on October 30, 2008.
2. Names of ports and types of construction projects;
(a) Port name: L;
(b) Kind of construction: Civil engineering;
4. The scale, period and method of works;
(a) Place of a construction project: K officer in the Gangnam-gun of Gangnam-gun;
(b) Scale of construction: The outer facility 315 meters, 413.86 meters, 240 meters, 240 meters, 1 type of site preparation ( dredging and reclamation), 225 meters, and other incidental facilities;
(d) Period of construction: From 2010 to 2016;
(e) On December 2008, the Administrator of the Regional Maritime Affairs and Port Office shall perform the Korea Rural Community Corporation and L construction works after the above public announcement.