Text
The plaintiff's appeal is dismissed.
Expenses for appeal shall be borne by the plaintiff.
Purport of claim and appeal
purport.
Reasons
1. During the date of the first accident on the date of registration of the Plaintiff’s vehicle, Category A G (K5 Habrid) (K5 Habrid) on December 16, 2017, 13:40 on December 16, 2018, 2017, the impact of the damaged vehicle that was parked on April 13:20 on August 24, 2017, 2018 3 CI) (BH on April 29, 2018) (Epiced 2.3 AWDD on December 30, 2017)
A. The Plaintiffs are the owners of each damaged vehicle at the time of the accident as listed below, and the Defendant is the insurer who has concluded an automobile insurance contract for the damaged vehicle which caused the traffic accident.
At the time of the accident of the Plaintiff, the main external-line panel (i.e., A6,257km 29,420,00 won 5,797,194 won and main external-line panel (i.e., e., e., g., e., g. g. g. g. g. g. g. g. g. g. g. g. g. g. g. g. g. g. g. g. m. 11,148 m. 27,960,000 g. g. 11,280,730 won at the time of the accident of the odometer at the time of the accident of the Plaintiff, k. k. k. k. k. k. k. k. k. k. k. k. k. g. g. g. g. g. g. g. g. g. g. g. g. g. g. k. k.) k.
B. The Plaintiffs’ vehicles were destroyed by an accident, and the odometer, repair details, etc. at the time of the accident are as listed below.
C. The Defendant paid KRW 518,100 to the Plaintiff A, KRW 1,577,480 to the Plaintiff B, and KRW 1,985,540 to the Plaintiff C, respectively, with insurance proceeds equivalent to the amount of damages arising from price decline.
[Ground of recognition] Unsatisfy, Gap's statements or images, each of Gap's evidence (including each number), and the court of first instance's commission of appraisal to the appraiser J, the purport of the whole pleadings
2. Determination
(a) In the event of an accident causing serious damage due to the occurrence of damage liability due to price decline, such as damage to the main structural frame of one motor vehicle, unless there are special circumstances, even if the technically feasible repair is completed.