logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 수원지방법원안양지원 2017.07.21 2015가합103178
공사대금
Text

1. The Defendant’s KRW 155,188,200 and the Plaintiff’s annual rate of KRW 6% from September 12, 2015 to July 21, 2017.

Reasons

1. Basic facts

A. On September 5, 2014, the Plaintiff entered into a construction contract with the Defendant to newly construct a building of seven stories above the ground surface of the first floor (hereinafter “instant construction contract”) with a personal business entity engaging in a construction business under the trade name of C, and details of the contract are as follows.

1. Name of construction: D Continuous construction works;

2. The place of the construction: D/Seo-gu, Ansan-gu.

3. Date of commencement: 30,000,000 won on February 5, 2015, where the date of initial completion falls: 30,000 won;

7. Advance payment: 20% of the construction amount.

8. A completed portion: 30 to 40% of the construction amount.

9. Remaining balance: The types of construction work (in the case of a multi-functional construction work, classified by type of work): the whole construction work, the contract amount of 840,000 won by type of work, the rate of defect warranty liability, 10,000 won, 3 years from the main structural parts of the defect warranty liability period, and 11 years and 10: 1/1,00 (0.1%) attached documents.

1. One copy of the general terms of a contract for private construction works;

2. A statement of calculation;

B. The Defendant received construction checks from E before entering into the instant construction contract, and included the estimated amount of KRW 843,00,000 (excluding value-added tax) and five months after the commencement of the construction period, and included the following separate construction details:

(hereinafter “Written estimate of this case”). 1. Taxes and public charges imposed under the name of the project owner shall be borne by the project owner (e.g., urban gas charges, metropolitan transportation facilities charges, water supply charges, water supply charges, sewage charges, sewage charges, sewage charges, electricity charges, etc.)

2. Sheet bags, mobile furniture bags (clocks, table tables, shockes, chairs, curtains, bedclothess, etc.) - including kitchens and shoess;

3. including household appliances (including published household appliances) - Exclusion from household appliances

4. Additional expenses incurred in inspecting asbestos before the removal of the existing building and removing asbestos therefrom;

5. Application of earth and sand plates to facilities with settling conditions and soil mounds at the time of the occurrence of soil and sand-based wastes at the time of underground excavation (excluding ruptures construction);

C. The Plaintiff commenced on September 16, 2014.

On June 16, 2015, the defendant has a ground leveled below the ground level.

arrow