1. In relation to a power plant accident that occurred on November 14, 2017, the Plaintiff’s respective liability for damages against the Defendants.

Reasons

1. The Intervenor’s Intervenor of the Korea Electric Power Corporation (hereinafter “Korea Electric Power Corporation”), based on the basic facts, supplies each contract power to the Defendants and Defendant 1. Supplementary Intervenor D Building Management Body (hereinafter “D Building”) through electric wires among the areas established at the Furcing Station.

The arrangement of electric wires among the above land shall be as shown in the attached Form.

It is often referred to as the connection point between the electrical equipment of the customer and the electric wire or wire wire with each of the electric users' demand and supply points of electricity at the Fridges, and it is often a ground-dispensing point located outside of the customer's building.

From the point of supply and demand to the point of supply and demand to the point of the Korea Electric Power Corporation, electricity is supplied to the underground wires of the customer from the point of supply and demand to the point of the individual customer's electric power facilities.

Therefore, in the event of a breakdown, such as damage to the above underground wires, the occurrence of a malfunction current exceeding the ordinary usage current, and the automatic operation of a stamper of the Furgator, thereby blocking electricity. As a result, not only broken electric wires but also all customers of the tracks connected thereto are also at all times static.

In the event of the occurrence of power failure, the failure and the sound section (unclaimed section) are connected with each other, so the Korea Electric Power Corporation shall generally grasp and separate the estimated failure section and conduct restoration in a normal way by giving priority to the sound section.

In addition, in the event that there are a wide range of damaged areas and multiple openings exist in the presumed sections of breakdowns, when the location of malfunctions is unclear after completion of the special line inspection of the broken section of the Operational Guidelines of the Power Distribution Center (9.5 Restoration Work), the Korea Electric Power Corporation may operate the opening section separately in accordance with the direction of the Power Distribution Center, separate the estimated section of malfunctions from the estimated section,

Provided, That this shall not apply to a section of power equipment withdrawn from a substation.

separation of broken sections in accordance with this subsection; and