(영문) 서울중앙지방법원 2017.09.27 2017고정2025
사문서위조등
Text

Defendant shall be punished by a fine of two million won.

If the defendant does not pay the above fine, KRW 100,000.

Reasons

Punishment of the crime

[Basic Facts] On April 20, 2016, the Defendant purchased the land B (hereinafter “instant land”) and the building of the second floor thereof (hereinafter “instant building”) in the name of ASEAN, and entered into a land trust contract with the Korea Saemaul Treasury (hereinafter “Korea Land Trust”) through the Korea Saemaul Treasury (hereinafter “Korea Land Trust”) and the security trust contract with the Korea Saemaul Bank (hereinafter “Korea Land Trust”) to prepare the purchase price.

5.2. The registration of the instant land and building was completed in the name of the land trust for the instant land and building, and it was requested to D, who operates the construction design office of the instant building, to remove the instant building and construct the 4th floor building.

D At the request of the Defendant on May 2016, 2016, access to the “Skwon”, which is an Internet construction administrative system site, and received a design plan, etc. for the construction of a building in the name of the owner C in the name of the owner, and the owner was a land trust for the owner, so it was returned to the Defendant on the ground that it should be prepared and submitted as an investment trust for the owner.

Accordingly, the defendant agrees from E, who is the employee in charge of land trust, to give all the powers in the process of preparing a civil petition and filing a petition through the Internet construction administrative system.

“Along with the power of attorney in the name of land trust for the content of “D,” the Plaintiff drawn up the documents in the name of the investment trust for D and ordered D to receive the said documents from the said scopter.

[Criminal facts]

1. On June 8, 2016, the Defendant, at the office located in Yeongdeungpo-gu Seoul Metropolitan Government FF on the part of the Defendant, knew at his/her discretion that the head of the seal impression in the name of the land trust for the purpose that D would be used to obtain a building permit. However, in order to prepare a standard contract for construction works with H, a new construction business operator of the building, and a standard contract for construction works, the said land trust name shall be