(영문) 인천지방법원 2017.01.19 2016고정2507
업무상과실치사등
Text

Defendants shall be punished by a fine of KRW 5,000,000.

Defendant

If A does not pay the above fine, it shall be 100.

Reasons

Punishment of the crime

When a business owner uses a mobile scrap, he/she shall comply with the standards for design of the mobile scrap in order to prevent the transformation or malfunction of steel materials, etc. constituting the structural parts of the mobile scrap, and in handling heavy objects, he/she shall prepare a work plan, including safety measures to prevent the rapid collapse of the fall and fall down in order to prevent the danger of workers, and shall perform the work in accordance with such plan, and shall perform the work in accordance with the plan, confirm whether he/she installs the arms mons, whether he/she is in charge of the work, whether he/she is in charge of the work, whether he/she is in charge of the work, whether he/she operates the warning, such as the center, etc., and shall provide safety education, etc. on the prohibition of the post-prevention, etc. of the danger of the shock.

Defendant

A is a person who is responsible for the safety and health of his employees as the site manager of the Defendant B who subcontracted the steel construction among the construction works jointly performed by Han Jin Heavy Industries, Large Forest Industry, Posco Construction, Posco Construction, Hanyang Construction Co., Ltd., and Hanyang Co., Ltd., and Defendant B is a corporation with the purpose of construction business, etc.

1. On November 10, 2015, around 10:15, the Defendant: (a) at the site of the steel frame works in Jung-gu Incheon, Jung-gu; (b) at the site of the steel frame works in Jung-gu, Incheon; (c) at the site of the construction works in question, G, Crest articles, operates a mobile track of about 50 tons, which is a structure for the roof of E roof (total of 43.8 tons, including a weight of 43.8 tons and a total of 46.8 tons, such as a weight of 3 tons); and (d) at the site of the construction works in question, whether he/she gets a proper load in accordance with the manufacture cost table of the Crest in order to prevent danger; and (e) whether he/she works in accordance with the work plan to prevent danger.