logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 광주지방법원 순천지원 2015.04.15 2015고정42
수질및수생태계보전에관한법률위반등
Text

Defendant shall be punished by a fine of KRW 4,000,000.

When the defendant does not pay the above fine, 100,000 won.

Reasons

Punishment of the crime

The defendant is the operator of C Co., Ltd. which is a corporation for the purpose of manufacturing steel products in Mineyang City B.

1. Any person who intends to install a waste-generating facility with a single emission process which does not flow out wastewater to the machinery or facilities in the circulation of the water from among the facilities discharging wastewater which does not include specific substances harmful to water quality or heavy metal, and with a capacity of the storage facility attached to the machinery or facilities above 0.1 cubic meters, shall file a report thereon with the Minister of Environment;

However, from Sep. 2013 to May 13, 2014, the Defendant, without reporting to the Minister of Environment from Sep. 2, 2013, discharged wastewater that does not include specific substances harmful to water quality or heavy metal, and operated a single discharge process, which does not leak wastewater to the outside during the circulation, and installed a steering gear, which is a discharge facility up to 5.9 cubic meters of the storage facility attached to the machine, with a capacity of 5.9 cubic meters.

2. Any person who intends to install a painting facility, the volume of which exceeds five cubic meters or the volume of power of which exceeds three miles, among emission facilities in which no specified hazardous air pollutants are generated, shall file a report thereon with the Minister of Environment;

However, from September 2013 to May 13, 2014, the Defendant, without reporting to the Minister of Environment, operated a painting facility using air compressed machines with a power of 50 masts.

Summary of Evidence

1. Defendant's legal statement;

1. Statement made to D by the police;

1. A written confirmation of violation, a photographic site, a reply as to whether the installation of emission facilities is possible, a report on investigation (examination of the relevant Acts and subordinate statutes), a prior notice of closure, the result of hearing on closure of an excreta facility, and the application

1. Relevant Article of the Acts and subordinate statutes concerning facts constituting an offense and the Act on the Selection of Water Quality and Ecosystem Conservation;

arrow