logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 대구지방법원 2014.04.16 2013고정2721
폭력행위등처벌에관한법률위반(공동주거침입)등
Text

Defendant

A shall be punished by a fine of KRW 3,000,000.

Defendant

If A does not pay the above fine, 50,000 won.

Reasons

Punishment of the crime

1. On March 16, 2013, at around 07:40, Defendants in violation of the Punishment of Violences, etc. Act (joint residence intrusion) moved one ton cargo vehicle into the victim F, Inc., Ltd., Inc., Inc., Ltd., Inc., the Gyeongbuk-gun, leaving the scene where a plant plant (clocks and sandd machines) is installed, Defendant A issued a work order, such as cutting the wires into the site and cutting the wires, etc., Defendant B, and C, upon receiving the work order, enter the site where the plant machine is installed, and Defendant B and C were not allowed to enter the site where the regular G of the victim company was installed. However, Defendant B and C entered the site, and Defendant B continued to carry the above cable with the victim’s cable 10,11,16,16-2, and 16-2, with the height of 23 meters in the site structure, and continued to carry the cable back from the victim’s place of business (hereinafter referred to as “the above cable”).

Accordingly, the Defendants jointly intruded on the structure managed by the victim.

2. Defendants in violation of the Punishment of Violences, etc. Act (joint property damage, etc.) destroyed electric cables equivalent to KRW 100,000 owned by the victimized company by cutting off electric cables connected to the consortiums in the same manner as the written in the preceding paragraph and using a electric cable connected to the consortiums in the same manner as the written in the preceding paragraph.

3. The Defendants, in collusion, interfered with the work, interfered with the victim’s duties by force by cutting electric cables (electric wires) at the time and place described in the preceding paragraph, and by cutting them into the method described in the preceding paragraph, preventing the production of recycled aggregates equivalent to 14,740,000 won in the plant machinery.

Summary of Evidence

1. The Defendants’ partial statements in the first trial record;

1. Each of the Defendants’ names.

arrow