Text
1. The plaintiff's claim is dismissed.
2. The costs of lawsuit shall be borne by the Plaintiff.
Reasons
1. Basic facts
A. The Defendant’s ownership is C. 5,164 square meters prior to the partition (hereinafter “instant land”). The said land was owned by the Defendant’s father E, but was transferred to the Defendant on January 27, 1978, according to the building management ledger on the above ground building, which was completed around 1960, 48.60 square meters, 7.14 square meters in a wooden jun joint roof warehouse, 6.51 square meters (6.25 square meters in total) in a wooden jun joint roof warehouse, jun jun jun ju, and 6.7 square meters in total, 1983, and 16.44 square meters in total, 26.9 square meters in total, 56 square meters in total, 1983, and 16.44 square meters in total, 56.264 square meters in total, 56.264 square meters in total, 1986 square meters in total, 986.264 square meters in total,
B. On April 17, 191, the land before the instant partition was divided into three hundred and seventy-eight square meters (the land category was changed to the building site on May 13, 1991; hereinafter “the land category”) and four thousand and seventy-eight86 square meters (hereinafter “the land No. 2”) before Jeju, and among which, on June 28, 200, the registration of ownership transfer was completed from the Defendant on June 27, 200 with respect to the land No. 1 of this case from G and H, the Defendant’s son, and thereafter on June 27, 2000.
C. In the building ledger of the building on the land of the instant case, the above paragraph (a) (the building (the total floor area of 93.27С) was completed on November 22, 1983 and September 25, 1989, and is completed on November 25, 1983, 31.27С, which was completed on September 25, 1989, and is registered in Jeju-si, as a building (the 31.27С, which was completed on September 25, 1989). The building is registered on the basis of the current status of the building registered on the above building ledger (the building stated on the construction permit of this case was not registered on the building ledger because it was not completed after completion inspection).